TRANSSHIPMENT OF AUTOCLAVES IN THE PORT OF ROSTOV-ON-DON
In May 2011, RTL handled two autoclaves in the port of Rostov-on-Don, length of each - 45 m and height - 3 m, weight of each is 105 t. Recovery train was used for transshipment of autoclaves in the port, and then it was loaded onto special transport.
TRANSPORTATION OF A DRILLING RIG FROM ROSTOV-ON-DON TO GROZNY
In August 2011 the drilling rig and components were transported from Rostov-on-Don to Grozny (Chechen Republic). It was reloaded from the vessel to the trucks with further shipment by 2 low-frame trailers.
DELIVERY OF TRANSFORMERS TO JSC PERVOURALSKY NOVOTRUBNY PLANT
In April-May, RTL carried out transportation of two transformers weighing 39,000 kg and 89,800 kg and three containers with a total weight of more than 58 t. Transportation was carried out from Ravenna, Italy to Pervouralsk, Russia via the port of Rostov-on-Don. Transshipment of transformers were made by recovery train in the port of Rostov-on-Don.
TRANSPORTATION OF TWO WHEELED CRANES FROM ROSTOV-ON-DON TO MANGYSHLAK (KAZAKHSTAN)
In June 2011, RTL implemented transportation of two wheeled cranes from Rostov-on-Don to Mangyshlak (Kazakhstan). Railway platforms with cover platforms were used for transportation. The cargo was accompanied by security guards.