2023
DELIVERY OF A MODERN BLAST FURNACE TO A FACTORY UNDER CONSTRUCTION IN NIZHNY NOVGOROD REGION
2023
DELIVERY OF EQUIPMENT TO A METALLURGICAL PLANT IN NIZHNY NOVGOROD REGION (RUSSIAN FEDERATION)
2023
DELIVERY OF EQUIPMENT TO THE SITE OF THE AMMONIA PLANT IN KINGISEPP (RUSSIAN FEDERATION)
2023
DELIVERY OF THREE THOUSAND TRUCKLOADS OF EQUIPMENT FOR MOSCOW REFINERY
2022
DELIVERY OF EQUIPMENT FOR A METALLURGICAL ENTERPRISE IN NIZHNY NOVGOROD REGION
2022
ENVIRONMENTAL ACTION FOR THE RELEASE OF STERLET FRY INTO THE WILD
2022
DELIVERY OF THERMAL VACUUM CHAMBER
RTL team has successfully delivered sections of Thermal Vacuum Chamber for simulation of space environment conditions, for testing of satellite equipment within framework of SPHERE project, announced in 2018 by President of the Russian Federation Vladimir Putin.
2021
Delivery of equipment for the construction of a hydrogen peroxide plant for Volga Peroxide LLC in Novocheboksarsk, Russia
The RTL team has implemented a technological equipment delivery project for the construction of a hydrogen peroxide production plant for Volga Peroxide LLC in Novocheboksarsk, Russia.
2020
International delivery of a maleic anhydride synthesis reactor for PJSC TATNEFT.
In the autumn 2020 RTL carried out an international delivery of a maleic anhydride synthesis reactor for PJSC TATNEFT
2020
Siemens gas turbine rotor
In 2020, RTL Group of Companies carried out transportation of oversized power equipment for Siemens Gas Turbine Technologies LLC (SGTT).
2020
Euro+ oil refining complex at the Gazprom Neft Moscow Refinery
In 2016 - 2018 RTL performed freight forwarding services and customs clearance of oversized and heavy lift cargo for the construction of the advanced Euro+ oil refining complex at the Gazprom Neft Moscow Refinery.
2020
DELIVERY OF A POOL REACTOR FOR A UREA PLANT
In the summer of 2020, RTL successfully delivered a pool reactor to the urea production plant in Togliatti, Samara region.
2019
CONSTRUCTION OF A COMPLEX FOR PROCESSING OIL RESIDUES
Project for project delivery for one of the Italian company of Maire Technimont group of companies to the address "Lukoil-Nizhegorodnefteorgsintez", Kstovo, Nizhny Novgorod region.
2019
CHEMICAL COMPLEX «AMMONIA UNIT WITH A CAPACITY 2100 PER DAY»
In spring and summer of 2019 RTL Group successfully carried out multimodal transportation of oversized and heavy-weight equipment for the construction of the chemical complex "Ammonia Unit with a capacity 2100 tn/day."
2019
A COMPLEX FOR THE PRODUCTION OF AMMONIA-UREA-MELAMINE BASED ON THE PURGE GAS PRODUCED BY METHANOL. PHASE II
In early 2018, RTL together with its Italian partner DSV won a major tender for the organization and forwarding support of project equipment transportation under the largest investment project in Perm region, Russia.
2019
HYDROCRACKING INSTALLATION
Delivery of reactors from Romania to Bashneft-Ufaneftekhim plant, Ufa 2019
2019
PROJECT OF TRANSPORTATION OF EQUIPMENT FOR THE CONSTRUCTION OF A WIND FARM IN STAVROPOL REGION
Our company has taken part in the implementation of the project of construction of the Kochubeevskaya Wind Farm in the Stavropol region, the largest wind park in Russia.
2019
8 THOUSAND PIPES DELIVERED FOR OIL & GAS INDUSTRY
Project logistics and oil & gas industry are two sides of the same coin.
2018
Delivery of grain harvesting equipment
Delivery of grain harvesting equipment from Rostov-on-Don to Mozambique, Africa.
2018
Construction of chemical complex “Ammonia-carbamide-melamine”. Phase I
Delivery of equipment for JSC “METAFRAX”
2018
Modernization of Mozyr Oil refinery. Stage 1
Delivery of equipment from Italy and Austria to the Mozyr Oil Refinery, Republic of Belarus, 2018
2018
Construction of «Chemical park Taraz»
Transportation of steam boilers by order of the Robert Bosh to the free economic zone «Chemical park Taraz», Shu, Kazakhstan
2017
MODERNIZATION OF THE MOSCOW OIL REFINERY (GAZPROMNEFT – MNPZ JSC). STAGE I
The barge was towed from Rostov-on-Don to Besedy berth in Moscow according to the designed towing project.
2017
CONSTRUCTION OF AN AMMONIA PLANT NEAR KINGISEPP. JSC "EUROCHEM NORTH-WEST". STAGE I
RTL has performed the transportation of the ammonia converter — in the work scope of the construction of an ammonia plant near the Kingisepp town.
2017
CONSTRUCTION OF AN AMMONIA PLANT NEAR KINGISEPP. JSC "EUROCHEM NORTH-WEST". PHASE II
RTL Company successfully transported in November 2017 a startup boiler for the construction of ammonia enterprise in Kingisepp in Russia.
2017
MODERNIZATION OF THE MOSCOW OIL REFINERY (GAZPROMNEFT – MNPZ JSC). PHASE II
RTL Company successfully delivered in August-September 2017 a batch of convection modules for the Moscow oil refinery of Gazpromneft.
2017
MODERNIZATION OF THE MOZYR OIL REFINERY. PHASE II
Company delivered oil equipment to Mozyr refinery.
2017
CONSTRUCTION OF AN AMMONIA PLANT NEAR KINGISEPP. JSC "EUROCHEM NORTH-WEST". PHASE III
In November 2017 an ammonia converter (613 tons) and carbon dioxide absorber (726 tons) were successfully transported for the construction of the ammonia enterprise in Kingisepp, Russia.
2016
MODERNIZATION OF THE MOSCOW OIL REFINERY (GAZPROMNEFT – MNPZ JSC). STAGE III
Four CCR Modules were manufactured in South Korea and delivered to the Port of St. Petersburg by two ocean-going vessels.
2016
MODERNIZATION OF THE MOSCOW OIL REFINERY (GAZPROMNEFT – MNPZ JSC). STAGE IV
Following the order from PJSC “Gazprom”, RTL Logistics Company has organized the transportation of equipment for Moscow Oil Refinery modernization.
2016
CONSTRUCTION OF AN OIL REFINERY IN THE CHINAREVSKY DISTRICT OF THE REPUBLIC OF KAZAKHSTAN
Delivery of equipment for oil refineries in Kazakhstan, 2016
2016
DELIVERY OF EQUIPMENT TO PAVLODAR PETROCHEMICAL PLANT, KAZAKHSTAN
2016
DELIVERY OF EQUIPMENT TO THE ADDRESS OF PJSC «TOLYATTIAZOT»
2016
DELIVERY CARGO FOR BELORUSSIAN ATOMIC POWER STATION
In July 2016 the project for delivery of four «ECCS Tanks» from «Petrozavodskmash» to Belorussian Atomic Power Station currently under construction was accomplished.
2015
DELIVERY OF TEREX A600 MOBILE CRANES TO THE REPUBLIC OF KAZAKHSTAN
RTL has implemented delivery of two Terex A600 mobile cranes. Each measured 12.75 x 3.00 x 3.58 meters and weighed 40,500 kg.
2015
EQUIPMENT DELIVERY TO THE ADDRESS OF TULA CEMENT PLANT
In March 2015 project for the delivery of equipment for the Tula cement plant from Izmir was realized.
2015
DELIVERY OF THE TRANSFORMER TO THE BELARUSIAN METALLURGICAL PLANT
In October 2015 RTL implemented delivery of transformer produced by the Italian company TES Transformer for the Belarusian Metallurgical Plant
2015
DELIVERY OF BACKUP ROLLS TO THE ADDRESS OF VYKSA STEEL WORKS AND MAGNITOGORSK IRON & STEEL WORKS
Very interesting project was completed in March 2015. Dispatch was organized through the port of Sankt-Peterburg.
2015
EQUIPMENT DELIVERY TO THE ADDRESS OF JSC “TATNEFT”
In the Autumn 2014 RTL LLC signed a contract with Italian company Walter Tosto for the transportation of equipment to the address of JSC “Tatneft”.
2015
DELIVERY OF WASTE HEAT BOILER PARTS TO KINGISEPP, LENINGRAD REGION
In September 2015 was implemented delivery of heavy equipment - parts of a waste heat boiler from Mumbai (India) to Kingisepp (Russia) via Ust-Luga port.
2014
Projects 2014
2013
Projects 2013
2012
Projects 2012
2011
Projects 2011
2010
Projects 2010
2009
Projects 2009
2008
Projects 2008
2007
Projects 2007
2006
Projects 2006
How it all began ...