Heavy rotors shipped to St. Petersburg and Moscow as part of the freight forwarding contract. Equipment dimensions on special supports:
12,700 x 3,880 x 3,223 mm, weight of each rotor: 62,005 kg. |
![]() |
improving the world!
RTL has developed and operated steadily since 2006 thanks to a professional team, high reliability of our relations with customers and the desire to find solutions that fully satisfy them and high assessment of our work by them. Also, We rely on young people, constantly train them and improve their skills, studying and adopting the best world experience.
RTL HAS EVERYTHING FOR HIGH-QUALITY IMPLEMENTATION OF PROJECTS
- Offices in the key transport hubs in Russia: Moscow, St. Petersburg, Novorossiysk, Rostov-on-Don, Yekaterinburg, Vladivostok, as well as in Italy and Ukraine.
- RTL has license of customs representative (License No. 0797/00 of 16.05.2017). We carry out customs clearance of import and export cargo within the framework of project transportation or as a separate service.
- The technical department of the company, consisting of engineers and technical experts, is engaged in the selection of transport for the transportation of cargo, develops cargo plans in the form of diagrams and full-fledged presentations, conducts surveys, develops method of statement.
- Our own construction department is engaged in the survey of engineering structures and road infrastructure, as well as the organization of construction and modernization of infrastructure for transportation (special berths, access roads, bridge structures), develops projects for the organization of road traffic and special projects for the transportation of heavy lift and oversize cargo.
The main clients of RTL are enterprises of the oil & gas and petrochemical industries, the energy sector, heavy industry.
Among the recent projects for which RTL has organized delivery of equipment are reconstruction of the Moscow oil refinery in the south-east of Moscow (JSC GAZPROMNEFT-MNPZ), the construction of an ammonia production plant in Kingisepp, Leningrad Region (JSC MHC EuroChem), the construction of the chemical complex "Ammonia-urea-melanin”, construction of a complex for processing oil residues in Kstovo, Nizhny Novgorod Region (LLC LUKOIL-Nizhegorodnefteorgsintez).
RTL provides services in Russia, CIS, Europe, and Asia. We also have experience working with countries in the Americas.
Crystallizers (2) weighting 63,500 kg, 1,446 х 687 х 703 cm. Stack-gas cooler weighing 113.40 tons, dimensions 24.06 x 8.20 x 8.20 m (dimensions assembled). |
![]() |
More than 30,000 tons of oversized cargo delivered by the Northern Sea Route under the upgrading project of Gazpromneft - Omsk oil refinery.
![]() |
2 CRANE SHIPS 8 BARGES 30 THS. TONS OF CARGO |
MCC EuroChem Launch of equipment delivery project as part of the construction of MCC EuroChem’s Ammonia lant in Kingisepp.
Oversized packages:4061 х 472 х 557 cm, 680 tons 3882 х 392 х 390 cm, 225 tons 1300 х 1100 х 820 cm, 213 tons 5500 х 7800 х 7900 cm, 726 tons |
![]() |
Launch of cargo delivery project as part of the upgrading program of The Gazprom Neft Moscow refinery. Total volume of shipments amounts to 200,000 freight tons.
Up to 260 tons of cargoes with dimensions of 60 x 8.0 x 7.5 meters were delivered under the project. |
![]() |
RTL becomes a member of the Chamber of Commerce and Industry of Rostov Region |
![]() |
RTL joins the IATA association and obtains a certificate of recognition from the Russian River Register |
![]() |
Working on a major project to deliver equipment for the construction of a nickel processing plant in Guatemala |
![]() |
RTL becomes a member of International Federation of Freight Forwarders Associations FIATA |
![]() |
RTL joins the Russian Association of Freight Forwarding |
![]() |
RTL obtains an ISO 9000 quality management certificate, which ensures that customers receive services of international standards. |
![]() |
RTL becomes one of the largest project cargo forwarders in the Southern Federal District |
![]() |
2 000 tons of cargo handled within the project, which amounted to 90% of the total supply of modules for the construction of the cardiovascular surgery hospitals in Krasnodar, Stavropol, and Krasnoyarsk. |
![]() |
15 000 m3 |
![]() |