Projects 2007

DELIVERY OF EQUIPMENT TO NOVOKUZNETSK METALLURGICAL PLANT

In December 2007 RTL delivered equipment to the Novokuznetsk Metallurgical Plant.

The delivery route was laid through the port of Rostov (Russia) and then by road to Novokuznetsk.

The distance of truck delivery - 4500 km.

Cargo:
The total volume of equipment - 1000 m³
 

Delivery OF EQUIPMENT FOR POLYETHYLENE PRODUCTION to NIZHNEKAMSK

Our company organized transit of equipment and its spare parts for production of polyethylene through the Russian ports of Rostov, Novorossiysk and the Ukrainian port of Mariupol. Then the cargo was delivered to Nizhnekamsk by road.

Cargo:

The maximum weight of an oversized seat is 110 t

The maximum height of the cargo items is 4.95 m
 

DELIVERY OF EQUIPMENT FOR VENEER PRODUCTION PLANT IN TAGANROG

Together with our Italian partners we have implemented the supply of the plant for the production of veneer from the Swiss city of Lengwil in Taganrog, Russia.

Delivery was made by road and rail, as well as by sea vessels.

Cargo:
The total volume of delivery is 3,000 m3, including 100x40 containers
The maximum weight of oversized item is 56 t

DELIVERY OF MEDICAL MODULES FOR CONSTRUCTION OF THE FEDERAL CENTER OF CARDIAC SURGERY IN ASTRAKHAN

Our company organized transshipment of medical modules manufactured by the German company in the port of Rostov-on-Don for the construction of cardiac centers in Astrakhan and Krasnodar.

Cargo:
The maximum weight of the module is 58 t
The total volume of equipment is 6 000 m3