8 (800) 770-02-91 +7 (495) 790-02-91

    

CONSTRUCTION OF AN OIL REFINERY IN THE CHINAREVSKY DISTRICT OF THE REPUBLIC OF KAZAKHSTAN

Delivery of equipment for oil refineries in Kazakhstan, 2016
Route:
Rostov-on-Don - Chinarevo, Kazakhstan

Cargo:
total weight of equipment - 1 583 500 kg, - 6 950 kbm
The heaviest unit 48.7 x 4.2 x 4.15 m, weighing 107.5 t

In spring, 2016 “RTL '' Company successfully delivered building materials for Oil Refinery construction at Chinarevo oil-field (Zelensky District) in Western Kazakhstan. Chinarevo oil-fiels is situated approximately 90 km to the North-West from the city of Uralsk, the overall volume of freight reaching 7 000 freight tons (1 583 500 kg, 6 950 cubic meters).

The overall number of road vehicles involved: 73. The cargo had been carried to the Port of Rostov by Volgo-Balt 216 and Anatoly Sidenko motor vessels with subsequent handling and transshipment to the trucks for further transportation and delivery to Chinarevo, passing the customs control at Uralsk Customs.

The main difficulty lay in clearing from the port and delivery of de-ethanizer column (48,7 х 4,2 х 4,15 m, 107.5 t weight). 48,7 х 4,2 м 4,15 м